Top ImageTop ImageTop ImageEmrgency Services
Large Image

Projects

Recent Projects

Water Cooling System for Rouge Steel
Bypass Pumping
Rouge Steel utilized the neighboring Rouge River for cooling their process systems. Due to the decreasing water table elevations in recent years, the water temperature in the cooling system had increased a few degrees to reach a dangerous level and risk an explosion in the steel mill. Read More...

Hurricane Katrina Recovery - St. Bernard Parish Lift Station Repairs
Bypass Pumping
MERSINO provided extensive bypass work to bring over 80
lift stations back online after flooding from Hurricane Katrina.
This project utilized dozens of pumps to handle the continuous and simultaneous bypass of 65 separate lift
stations. Read More...

ReCon Trench Collection Dewatering System
Dewatering
MERSINO installed dewatering collection trenches to remove the impacted water for the soil remediation project for the Kaiser site in Tulsa, OK. Read More...

Richfield Landfill Soil Bentonite Slurry Wall
One-Pass Trenching
MERSINO was contracted to construct a Hydraulic Containment System consisting of a soil-bentonite wall and gravity drain system for Richfield Landfill. Read More...

Citizens Landfill Aquifer Protection Project
One-Pass Trenching
MERSINO was hired to properly abandon existing wells at Citizen's Landfill. MERSINO worked in accordance with MDEQ standards in order to maintain the integrity of the constructed cell, thereby protecting the existing aquifer. Read More...